 Procedure Qualification Record (PQR)

Welding Procedure Specification (WPS)

Welder’s Qualification Test Report (WQTR)

Coupon Traceability Record 

Borescope Inspection Reports

Daily Weld Inspection Logs

Rejected Weld Logs

Blind / Closure Weld Log

Piping Pressure Test Reports

Nonconformance Reports

Material Inspection Reports (with MTRs)

Cleanroom Certification Reports

Standard Operating Procedures

Calibration Record

Field Revision Request

Gas Analysis Log

Inspection & Test Plan 

 SYSTEM TEST PACKAGE

Application for Inspection

Completed Test Pack

Welding Acceptance Certificate

Piping Test Pack Approval to Test

Installation Punch List

Piping Pre-Test Checklist

Piping Pressure Test Certificate

Piping Post-Test/Reinstatement Checklist

Pressure Gauge Calibration Register

Piping Flushing Report

Passivation Protocol Record

Piping and Instrument Diagram

Summary of Controlled Isometrics

Controlled Isometrics

Documentation (Biotechnology / Pharmaceutical)

 

Puricon generates complete project turnover documentation packages at the end of every project.

 

Our turnover package typically includes the following documents:

Field Operation Reporting & Management System

 

Puricon utilizes the FORMS (Field Operation Reporting & Management System) database to allow real-time tracking of installation and testing progress and to insure that all deficiency noted in the field are tracked until resolution. The FORMS database contains all project QA/QC documents including inspection reports, nonconformance report, deficiency lists as well as a record of contractor equipment and total man-hours onsite. A daily report is generated which gives a snapshot system status on the systems that are approaching their scheduled due date. The report also details all outstanding deficiency list and nonconformance items. A weekly report is generated which summarizes the activities of the Puricon site personnel and can later serve as a record of all QA/Construction correspondence between the Puricon representatives and the contractor. Puricon can also install the FORMS database on the customer’s project office network in order to enable customers to access information at their convenience.

Procedure Qualification Record (PQR)

Welding Procedure Specification (WPS)

Welder’s Qualification Test Report (WQTR)

Daily Weld Coupon Logs

Daily Weld Inspection Logs

Material Inspection Reports

Piping Pressure Test Reports

Helium Leak Test Reports

Analytical Test Reports (H2O, O2, THC)

Particle Count Test Reports

Cleanroom Certification Reports

FORMS (Field Operation Report & Management System)

Nonconformance Report

Deficiency Tracking

Memorandum Report

Photograph Report

Protocol Appraisal / Discrepancy Report

Submittal Review Report

Installation Progress Report

Project – Minutes of Meeting Report

Project Activity Summary Report

Daily Activity Entry

Documentation (Semiconductor & Flat Panel Display)

 

Puricon generates complete project turnover documentation packages at the end of every project.

 

Our turnover package typically includes the following documents:

 

`